Reinventing Formulas for Construction Project Delay Index Due to Management and Production
Abstract
Doi: 10.28991/HIJ-2023-04-04-06
Full Text: PDF
Keywords
References
Olanrewaju, A., Tan, S. Y., & Kwan, L. F. (2017). Roles of Communication on Performance of the Construction Sector. Procedia Engineering, 196, 763–770. doi:10.1016/j.proeng.2017.08.005.
Fashina, A. A., Omar, M. A., Sheikh, A. A., & Fakunle, F. F. (2021). Exploring the significant factors that influence delays in construction projects in Hargeisa. Heliyon, 7(4), 6826. doi:10.1016/j.heliyon.2021.e06826.
Silaghi, F., & Sarkar, S. (2021). Agency problems in public-private partnerships investment projects. European Journal of Operational Research, 290(3), 1174–1191. doi:10.1016/j.ejor.2020.08.050.
Li, F., Xu, Z., & Li, H. (2021). A multi-agent based cooperative approach to decentralized multi-project scheduling and resource allocation. Computers and Industrial Engineering, 151, 106961. doi:10.1016/j.cie.2020.106961.
Modi, K., Lowalekar, H., & Bhatta, N. M. K. (2019). Revolutionizing supply chain management the theory of constraints way: a case study. International Journal of Production Research, 57(11), 3335–3361. doi:10.1080/00207543.2018.1523579.
Muriana, C., & Vizzini, G. (2017). Project risk management: A deterministic quantitative technique for assessment and mitigation. International Journal of Project Management, 35(3), 320–340. doi:10.1016/j.ijproman.2017.01.010.
Guo, S., Xiong, C., & Gong, P. (2018). A real-time control approach based on intelligent video surveillance for violations by construction workers. Journal of Civil Engineering and Management, 24(1), 67–78. doi:10.3846/jcem.2018.301.
Kong, L., Li, H., Luo, H., Ding, L., & Zhang, X. (2018). Sustainable performance of Just-In-Time (JIT) management in time-dependent batch delivery scheduling of precast construction. Journal of Cleaner Production, 193, 684–701. doi:10.1016/j.jclepro.2018.05.037.
Hsu, P. Y., Aurisicchio, M., & Angeloudis, P. (2017). Investigating Schedule Deviation in Construction Projects through Root Cause Analysis. Procedia Computer Science, 121, 732–739. doi:10.1016/j.procs.2017.11.095.
Milička, P., Šůcha, P., Vanhoucke, M., & Maenhout, B. (2022). The bilevel optimisation of a multi-agent project scheduling and staffing problem. European Journal of Operational Research, 296(1), 72–86. doi:10.1016/j.ejor.2021.03.028.
Alsuliman, J. A. (2019). Causes of delay in Saudi public construction projects. Alexandria Engineering Journal, 58(2), 801–808. doi:10.1016/j.aej.2019.07.002.
Liu, M., Le, Y., Hu, Y., Xia, B., Skitmore, M., & Gao, X. (2019). System dynamics modeling for construction management research: Critical review and future trends. Journal of Civil Engineering and Management, 25(8), 730–741. doi:10.3846/jcem.2019.10518.
de Araújo, M. C. B., Alencar, L. H., & de Miranda Mota, C. M. (2017). Project procurement management: A structured literature review. International Journal of Project Management, 35(3), 353–377. doi:10.1016/j.ijproman.2017.01.008.
Martens, A., & Vanhoucke, M. (2018). An empirical validation of the performance of project control tolerance limits. Automation in Construction, 89, 71–85. doi:10.1016/j.autcon.2018.01.002.
Lee, C., & Won, J. (2021). Analysis of construction productivity based on construction duration per floor and per gross area, with identification of influential factors. Journal of Civil Engineering and Management, 27(3), 203–216. doi:10.3846/jcem.2021.14514.
Korhonen, T., Jääskeläinen, A., Laine, T., & Saukkonen, N. (2023). How performance measurement can support achieving success in project-based operations. International Journal of Project Management, 41(1), 102429. doi:10.1016/j.ijproman.2022.11.002.
Liu, Y., You, K., Jiang, Y., Wu, Z., Liu, Z., Peng, G., & Zhou, C. (2022). Multi-objective optimal scheduling of automated construction equipment using non-dominated sorting genetic algorithm (NSGA-III). Automation in Construction, 143, 104587. doi:10.1016/j.autcon.2022.104587.
Chou, J. S., Chen, Y. H., Liu, C. Y., & Chong, W. O. (2023). Quality Management Platform Inspired During Covid-19 Pandemic for Use By Subcontractors in Private Housing Projects. Journal of Civil Engineering and Management, 29(5), 398–417. doi:10.3846/jcem.2023.18687.
Zahid, T., Agha, M. H., & Schmidt, T. (2019). Investigation of surrogate measures of robustness for project scheduling problems. Computers and Industrial Engineering, 129, 220–227. doi:10.1016/j.cie.2019.01.041.
Wang, X., Li, Z., Chen, Q., & Mao, N. (2020). Meta-heuristics for unrelated parallel machines scheduling with random rework to minimize expected total weighted tardiness. Computers and Industrial Engineering, 145, 106505. doi:10.1016/j.cie.2020.106505.
Arditi, D., Nayak, S., & Damci, A. (2017). Effect of organizational culture on delay in construction. International Journal of Project Management, 35(2), 136–147. doi:10.1016/j.ijproman.2016.10.018.
Chen, C. S., Tsui, Y. K., Dzeng, R. J., & Wang, W. C. (2015). Application of project-based change management in construction: A case study. Journal of Civil Engineering and Management, 21(1), 107–118. doi:10.3846/13923730.2013.802712.
Al-Hazim, N., Salem, Z. A., & Ahmad, H. (2017). Delay and Cost Overrun in Infrastructure Projects in Jordan. Procedia Engineering, 182, 18–24. doi:10.1016/j.proeng.2017.03.105.
Yap, J. B. H., Goay, P. L., Woon, Y. B., & Skitmore, M. (2021). Revisiting critical delay factors for construction: Analysing projects in Malaysia. Alexandria Engineering Journal, 60(1), 1717–1729. doi:10.1016/j.aej.2020.11.021.
Kale, S., & Karaman, A. E. (2012). Benchmarking the knowledge management practices of construction firms. Journal of Civil Engineering and Management, 18(3), 335–344. doi:10.3846/13923730.2012.698910.
Ssegawa, J. K., & Muzinda, M. (2021). Feasibility assessment framework (FAF): A systematic and objective approach for assessing the viability of a project. Procedia Computer Science, 181, 377–385. doi:10.1016/j.procs.2021.01.180.
Rashidi, S., Naghshineh, N., Fahim Nia, F., Izadkhah, Y. O., & Saghafi, F. (2022). How feasible is creating a natural disaster information management open-access repository (NDIM-OAR) in Iran? Library and Information Science Research, 44(4), 101203. doi:10.1016/j.lisr.2022.101203.
Ma, G., Wu, M., Wu, Z., & Yang, W. (2021). Single-shot multibox detector- and building information modeling-based quality inspection model for construction projects. Journal of Building Engineering, 38, 102216. doi:10.1016/j.jobe.2021.102216.
Eriksson, P. E., Larsson, J., & Pesämaa, O. (2017). Managing complex projects in the infrastructure sector - A structural equation model for flexibility-focused project management. International Journal of Project Management, 35(8), 1512–1523. doi:10.1016/j.ijproman.2017.08.015.
Xu, X., Wang, J., Li, C. Z., Huang, W., & Xia, N. (2018). Schedule risk analysis of infrastructure projects: A hybrid dynamic approach. Automation in Construction, 95, 20–34. doi:10.1016/j.autcon.2018.07.026.
Demirkesen, S., & Ozorhon, B. (2017). Impact of integration management on construction project management performance. International Journal of Project Management, 35(8), 1639–1654. doi:10.1016/j.ijproman.2017.09.008.
Abduh, M., Soemardi, B. W., & Wirahadikusumah, R. D. (2012). Indonesian construction supply chains cost structure and factors: A case study of two projects. Journal of Civil Engineering and Management, 18(2), 209–216. doi:10.3846/13923730.2012.671259.
Abbasianjahromi, H., Rajaie, H., & Shakeri, E. (2013). A framework for subcontractor selection in the construction industry. Journal of Civil Engineering and Management, 19(2), 158–168. doi:10.3846/13923730.2012.743922.
Daboun, O., Abidin, N. I., Khoso, A. R., Chen, Z. S., Yusof, A. M., & Skibniewski, M. J. (2023). Effect of Relationship Management on Construction Project Success Delivery. Journal of Civil Engineering and Management, 29(5), 372–397. doi:10.3846/jcem.2023.18827.
Olawumi, T. O., & Chan, D. W. M. (2018). Building information modelling and project information management framework for construction projects. Journal of Civil Engineering and Management, 25(1), 53–75. doi:10.3846/jcem.2019.7841.
Ahmad, Z., Thaheem, M. J., & Maqsoom, A. (2018). Building information modeling as a risk transformer: An evolutionary insight into the project uncertainty. Automation in Construction, 92, 103–119. doi:10.1016/j.autcon.2018.03.032.
Chen, J. H., & Chen, W. H. (2012). Contractor costs of factoring account receivables for a construction project. Journal of Civil Engineering and Management, 18(2), 227–234. doi:10.3846/13923730.2012.671272.
Abuimara, T., Hobson, B. W., Gunay, B., O’Brien, W., & Kane, M. (2021). Current state and future challenges in building management: Practitioner interviews and a literature review. Journal of Building Engineering, 41, 102803. doi:10.1016/j.jobe.2021.102803.
Sierla, S., Pourakbari-Kasmaei, M., & Vyatkin, V. (2022). A taxonomy of machine learning applications for virtual power plants and home/building energy management systems. Automation in Construction, 136, 104174. doi:10.1016/j.autcon.2022.104174.
Cheng, J. C. P., Liu, H., Gan, V. J. L., Das, M., Tao, X., & Zhou, S. (2023). Construction cost management using blockchain and encryption. Automation in Construction, 152, 104841. doi:10.1016/j.autcon.2023.104841.
DOI: 10.28991/HIJ-2023-04-04-06
Refbacks
- There are currently no refbacks.
Copyright (c) 2024 Putri Lynna A. Luthan, Nathanael Sitanggang, Syafriandi Syafriandi