Reinventing Formulas for Construction Project Delay Index Due to Management and Production

Putri Lynna A. Luthan, Nathanael Sitanggang, Syafriandi Syafriandi

Abstract


The objective of this study is to construct a precise formula for the management and production delay indicators that are integrated into Ms. Project's dashboard. Two simulation techniques, such as the manual formula computation and calculation integrated into the Ms. Project dashboard, were employed. Due to management and the production team's tardiness, the data were obtained through trial-and-error methods. Excel was used to analyze the data, and Ms. Project was used to enter the calculations. The research showed that the Ms. Project dashboard formula gave more detailed information about the construction project, including: (1) contract value; (2) actual progress value during monitoring; (3) value of plan progress during monitoring; (4) progress deviation; (5) cause of delay; and (6) management delay index and production delay index. The novelty of this study is that project delays have traditionally been held against the production party (contractor), whereas implementation delays have never been taken against the management party (consultant). However, using this method makes it evident who is responsible for a project delay, whether it comes from management (a consultant) or the manufacturing side (a contractor).

 

Doi: 10.28991/HIJ-2023-04-04-06

Full Text: PDF


Keywords


Formula; Index of Delay; Management; Production.

References


Olanrewaju, A., Tan, S. Y., & Kwan, L. F. (2017). Roles of Communication on Performance of the Construction Sector. Procedia Engineering, 196, 763–770. doi:10.1016/j.proeng.2017.08.005.

Fashina, A. A., Omar, M. A., Sheikh, A. A., & Fakunle, F. F. (2021). Exploring the significant factors that influence delays in construction projects in Hargeisa. Heliyon, 7(4), 6826. doi:10.1016/j.heliyon.2021.e06826.

Silaghi, F., & Sarkar, S. (2021). Agency problems in public-private partnerships investment projects. European Journal of Operational Research, 290(3), 1174–1191. doi:10.1016/j.ejor.2020.08.050.

Li, F., Xu, Z., & Li, H. (2021). A multi-agent based cooperative approach to decentralized multi-project scheduling and resource allocation. Computers and Industrial Engineering, 151, 106961. doi:10.1016/j.cie.2020.106961.

Modi, K., Lowalekar, H., & Bhatta, N. M. K. (2019). Revolutionizing supply chain management the theory of constraints way: a case study. International Journal of Production Research, 57(11), 3335–3361. doi:10.1080/00207543.2018.1523579.

Muriana, C., & Vizzini, G. (2017). Project risk management: A deterministic quantitative technique for assessment and mitigation. International Journal of Project Management, 35(3), 320–340. doi:10.1016/j.ijproman.2017.01.010.

Guo, S., Xiong, C., & Gong, P. (2018). A real-time control approach based on intelligent video surveillance for violations by construction workers. Journal of Civil Engineering and Management, 24(1), 67–78. doi:10.3846/jcem.2018.301.

Kong, L., Li, H., Luo, H., Ding, L., & Zhang, X. (2018). Sustainable performance of Just-In-Time (JIT) management in time-dependent batch delivery scheduling of precast construction. Journal of Cleaner Production, 193, 684–701. doi:10.1016/j.jclepro.2018.05.037.

Hsu, P. Y., Aurisicchio, M., & Angeloudis, P. (2017). Investigating Schedule Deviation in Construction Projects through Root Cause Analysis. Procedia Computer Science, 121, 732–739. doi:10.1016/j.procs.2017.11.095.

Milička, P., Šůcha, P., Vanhoucke, M., & Maenhout, B. (2022). The bilevel optimisation of a multi-agent project scheduling and staffing problem. European Journal of Operational Research, 296(1), 72–86. doi:10.1016/j.ejor.2021.03.028.

Alsuliman, J. A. (2019). Causes of delay in Saudi public construction projects. Alexandria Engineering Journal, 58(2), 801–808. doi:10.1016/j.aej.2019.07.002.

Liu, M., Le, Y., Hu, Y., Xia, B., Skitmore, M., & Gao, X. (2019). System dynamics modeling for construction management research: Critical review and future trends. Journal of Civil Engineering and Management, 25(8), 730–741. doi:10.3846/jcem.2019.10518.

de Araújo, M. C. B., Alencar, L. H., & de Miranda Mota, C. M. (2017). Project procurement management: A structured literature review. International Journal of Project Management, 35(3), 353–377. doi:10.1016/j.ijproman.2017.01.008.

Martens, A., & Vanhoucke, M. (2018). An empirical validation of the performance of project control tolerance limits. Automation in Construction, 89, 71–85. doi:10.1016/j.autcon.2018.01.002.

Lee, C., & Won, J. (2021). Analysis of construction productivity based on construction duration per floor and per gross area, with identification of influential factors. Journal of Civil Engineering and Management, 27(3), 203–216. doi:10.3846/jcem.2021.14514.

Korhonen, T., Jääskeläinen, A., Laine, T., & Saukkonen, N. (2023). How performance measurement can support achieving success in project-based operations. International Journal of Project Management, 41(1), 102429. doi:10.1016/j.ijproman.2022.11.002.

Liu, Y., You, K., Jiang, Y., Wu, Z., Liu, Z., Peng, G., & Zhou, C. (2022). Multi-objective optimal scheduling of automated construction equipment using non-dominated sorting genetic algorithm (NSGA-III). Automation in Construction, 143, 104587. doi:10.1016/j.autcon.2022.104587.

Chou, J. S., Chen, Y. H., Liu, C. Y., & Chong, W. O. (2023). Quality Management Platform Inspired During Covid-19 Pandemic for Use By Subcontractors in Private Housing Projects. Journal of Civil Engineering and Management, 29(5), 398–417. doi:10.3846/jcem.2023.18687.

Zahid, T., Agha, M. H., & Schmidt, T. (2019). Investigation of surrogate measures of robustness for project scheduling problems. Computers and Industrial Engineering, 129, 220–227. doi:10.1016/j.cie.2019.01.041.

Wang, X., Li, Z., Chen, Q., & Mao, N. (2020). Meta-heuristics for unrelated parallel machines scheduling with random rework to minimize expected total weighted tardiness. Computers and Industrial Engineering, 145, 106505. doi:10.1016/j.cie.2020.106505.

Arditi, D., Nayak, S., & Damci, A. (2017). Effect of organizational culture on delay in construction. International Journal of Project Management, 35(2), 136–147. doi:10.1016/j.ijproman.2016.10.018.

Chen, C. S., Tsui, Y. K., Dzeng, R. J., & Wang, W. C. (2015). Application of project-based change management in construction: A case study. Journal of Civil Engineering and Management, 21(1), 107–118. doi:10.3846/13923730.2013.802712.

Al-Hazim, N., Salem, Z. A., & Ahmad, H. (2017). Delay and Cost Overrun in Infrastructure Projects in Jordan. Procedia Engineering, 182, 18–24. doi:10.1016/j.proeng.2017.03.105.

Yap, J. B. H., Goay, P. L., Woon, Y. B., & Skitmore, M. (2021). Revisiting critical delay factors for construction: Analysing projects in Malaysia. Alexandria Engineering Journal, 60(1), 1717–1729. doi:10.1016/j.aej.2020.11.021.

Kale, S., & Karaman, A. E. (2012). Benchmarking the knowledge management practices of construction firms. Journal of Civil Engineering and Management, 18(3), 335–344. doi:10.3846/13923730.2012.698910.

Ssegawa, J. K., & Muzinda, M. (2021). Feasibility assessment framework (FAF): A systematic and objective approach for assessing the viability of a project. Procedia Computer Science, 181, 377–385. doi:10.1016/j.procs.2021.01.180.

Rashidi, S., Naghshineh, N., Fahim Nia, F., Izadkhah, Y. O., & Saghafi, F. (2022). How feasible is creating a natural disaster information management open-access repository (NDIM-OAR) in Iran? Library and Information Science Research, 44(4), 101203. doi:10.1016/j.lisr.2022.101203.

Ma, G., Wu, M., Wu, Z., & Yang, W. (2021). Single-shot multibox detector- and building information modeling-based quality inspection model for construction projects. Journal of Building Engineering, 38, 102216. doi:10.1016/j.jobe.2021.102216.

Eriksson, P. E., Larsson, J., & Pesämaa, O. (2017). Managing complex projects in the infrastructure sector - A structural equation model for flexibility-focused project management. International Journal of Project Management, 35(8), 1512–1523. doi:10.1016/j.ijproman.2017.08.015.

Xu, X., Wang, J., Li, C. Z., Huang, W., & Xia, N. (2018). Schedule risk analysis of infrastructure projects: A hybrid dynamic approach. Automation in Construction, 95, 20–34. doi:10.1016/j.autcon.2018.07.026.

Demirkesen, S., & Ozorhon, B. (2017). Impact of integration management on construction project management performance. International Journal of Project Management, 35(8), 1639–1654. doi:10.1016/j.ijproman.2017.09.008.

Abduh, M., Soemardi, B. W., & Wirahadikusumah, R. D. (2012). Indonesian construction supply chains cost structure and factors: A case study of two projects. Journal of Civil Engineering and Management, 18(2), 209–216. doi:10.3846/13923730.2012.671259.

Abbasianjahromi, H., Rajaie, H., & Shakeri, E. (2013). A framework for subcontractor selection in the construction industry. Journal of Civil Engineering and Management, 19(2), 158–168. doi:10.3846/13923730.2012.743922.

Daboun, O., Abidin, N. I., Khoso, A. R., Chen, Z. S., Yusof, A. M., & Skibniewski, M. J. (2023). Effect of Relationship Management on Construction Project Success Delivery. Journal of Civil Engineering and Management, 29(5), 372–397. doi:10.3846/jcem.2023.18827.

Olawumi, T. O., & Chan, D. W. M. (2018). Building information modelling and project information management framework for construction projects. Journal of Civil Engineering and Management, 25(1), 53–75. doi:10.3846/jcem.2019.7841.

Ahmad, Z., Thaheem, M. J., & Maqsoom, A. (2018). Building information modeling as a risk transformer: An evolutionary insight into the project uncertainty. Automation in Construction, 92, 103–119. doi:10.1016/j.autcon.2018.03.032.

Chen, J. H., & Chen, W. H. (2012). Contractor costs of factoring account receivables for a construction project. Journal of Civil Engineering and Management, 18(2), 227–234. doi:10.3846/13923730.2012.671272.

Abuimara, T., Hobson, B. W., Gunay, B., O’Brien, W., & Kane, M. (2021). Current state and future challenges in building management: Practitioner interviews and a literature review. Journal of Building Engineering, 41, 102803. doi:10.1016/j.jobe.2021.102803.

Sierla, S., Pourakbari-Kasmaei, M., & Vyatkin, V. (2022). A taxonomy of machine learning applications for virtual power plants and home/building energy management systems. Automation in Construction, 136, 104174. doi:10.1016/j.autcon.2022.104174.

Cheng, J. C. P., Liu, H., Gan, V. J. L., Das, M., Tao, X., & Zhou, S. (2023). Construction cost management using blockchain and encryption. Automation in Construction, 152, 104841. doi:10.1016/j.autcon.2023.104841.


Full Text: PDF

DOI: 10.28991/HIJ-2023-04-04-06

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 Putri Lynna A. Luthan, Nathanael Sitanggang, Syafriandi Syafriandi